How to Migrate to Google Cloud: A Step-by-Step Data Migration Guide (2026)

Blog post cover: how to migrate data to Google Cloud

Updated · 7 min read · Business Insights, Cloud & Data Engineering

Migrating to Google Cloud means moving your data, databases and applications from your own servers or another cloud to Google Cloud Platform (GCP), in a planned sequence that keeps the business running. Done well, it lowers infrastructure costs and opens the door to Google’s data and AI services, such as BigQuery and Vertex AI. Done in a hurry, it moves old problems to a more expensive place. This guide explains the five steps of a Google Cloud migration, which migration tool fits which kind of data, and the mistakes we see most often.

Why companies migrate to Google Cloud

The general benefits of the cloud apply to every provider: you pay for what you use, scale when you need to, and stop maintaining hardware. The reasons we hear most often for choosing Google Cloud specifically are:

  • Data and analytics. BigQuery lets you query terabytes of data without managing a database server.
  • AI. Vertex AI and Gemini models work directly on data already in Google Cloud.
  • Containers. Google Kubernetes Engine (GKE) is a mature home for container-based applications.
  • Existing Google Workspace use and Google’s migration programmes and credits for new customers.

If you are still choosing a provider, see our comparison of AWS, Azure and Google Cloud.

Step 1: Assess what you have

A migration starts with an inventory, not with a transfer. List the servers, databases, applications and data sets you run, how big they are, how they depend on each other and who owns them. Google’s free Migration Center discovers your servers and estimates what they would cost on Google Cloud, which gives you a first business case.

At this stage, also decide what not to move. Data nobody uses and applications due to be replaced are cheaper to archive or retire than to migrate.

Step 2: Plan the migration strategy

For each workload, choose one of the common migration strategies:

Strategy What it means When it fits
Rehost (“lift and shift”) Move virtual machines as they are Fast exits from a data centre, little time
Replatform Move with small changes, e.g. a self-managed database to Cloud SQL Quick savings on maintenance
Refactor Redesign for the cloud: containers, serverless, managed services Applications that will keep growing
Replace Switch to a SaaS product Commodity systems (e-mail, CRM)
Retire / retain Switch off, or keep on-premises for now Unused or regulated systems

Then group the workloads into waves. Start with something useful but low-risk, so the team learns the process before moving business-critical systems. Plan the cut-over and the rollback for each wave: how long the old system stays available and how you switch back if something goes wrong.

Step 3: Prepare the landing zone

Before any data arrives, set up the Google Cloud foundation: the organisation and project structure, identity and access (who can do what), the network, security policies, logging and a billing budget with alerts. This “landing zone” is much harder to fix after workloads are running on it.

Prepare the data too: remove duplicates, compress archives and clean up formats. Less data is faster and cheaper to transfer and to store.

Step 4: Move the data with the right tool

Google Cloud has a dedicated migration tool for each kind of workload:

What you move Google Cloud tool
Files from another cloud (AWS S3, Azure Blob) or on-premises storage Storage Transfer Service
Very large data sets (tens of terabytes or more) over a slow connection Transfer Appliance – a physical device shipped to your site
Smaller files from a developer machine gcloud storage command-line tool
MySQL, PostgreSQL, SQL Server and Oracle databases Database Migration Service, with continuous replication until cut-over
Ongoing change data capture from databases to BigQuery Datastream
Data from SaaS tools and other warehouses into BigQuery BigQuery Data Transfer Service
Virtual machines (VMware, AWS, Azure, physical servers) Migrate to Virtual Machines

Network matters for large transfers. A public internet connection is the cheapest; Cloud Interconnect gives a dedicated, faster and more predictable link. A simple rule: if moving the data over your current connection would take more than about a week, consider Transfer Appliance or a faster link.

For databases, avoid a long downtime by replicating continuously: the old database keeps serving users while the copy in Google Cloud catches up, and you switch over in minutes.

Step 5: Validate, switch over and optimise

After each transfer, check that the data is complete and correct: row counts, checksums and a test of the key reports and processes. Switch users over, keep the old system read-only for an agreed time, then turn it off.

The work doesn’t end at the cut-over. In the first months, right-size the machines, use committed-use discounts for steady workloads, move archives to cheaper storage classes and watch the bill against the budget. This is often where the savings promised in the business case are actually made.

Common Google Cloud migration mistakes

  • Moving everything as it is. Lift and shift is fast, but without later optimisation the cloud bill can exceed the old data centre’s costs.
  • No landing zone. Projects, permissions and networks created ad hoc become a security and cost problem.
  • Underestimating transfer time. Network bandwidth, not the tools, usually sets the schedule.
  • No rollback plan. Every wave needs a way back.
  • Skipping validation. A migration is finished when the business has checked the data, not when the copy completes.
  • Forgetting the people. The team that runs the systems needs training on Google Cloud before, not after, the move.

How long does a migration to Google Cloud take?

A single application or data set can move in a few weeks. A typical small or mid-sized company moving its main systems needs two to six months, most of it on assessment, planning and testing rather than on the transfer itself. Large estates move in waves over a year or more.

Working with a partner

You can migrate on your own with Google’s documentation and tools, but an experienced team shortens the plan and avoids the expensive mistakes above. At Stepwise we assess the current setup, plan the waves, build the landing zone and move data and applications to Google Cloud, including open-source databases and workloads leaving virtual machines. See our cloud migration services or contact our team to plan yours.

Frequently asked questions

How do I migrate data to Google Cloud?

Assess and clean up the data, set up the Google Cloud project, permissions and network, then use the tool that matches the source: Storage Transfer Service for files from other clouds or your servers, Transfer Appliance for very large data sets, Database Migration Service for databases and BigQuery Data Transfer Service for SaaS data. Validate the data before switching over.

What is the best tool to migrate to Google Cloud?

There is no single tool. Migration Center helps you assess and plan; Migrate to Virtual Machines moves servers; Database Migration Service moves databases with minimal downtime; Storage Transfer Service and Transfer Appliance move files and objects.

How much does it cost to migrate to Google Cloud?

Google’s migration tools are free or low-cost to use; you pay for the Google Cloud resources you run, data transfer out of your current provider, and the team’s time. Most of the cost is planning, testing and optimisation work, which is why the assessment step pays for itself.

Can I migrate from AWS or Azure to Google Cloud?

Yes. Storage Transfer Service copies data directly from Amazon S3 and Azure Blob Storage, Database Migration Service moves managed databases, and Migrate to Virtual Machines moves AWS EC2 and Azure virtual machines. Check your current provider’s data egress fees when you plan the budget.

  • Business Strategy
  • Cloud Services
  • Google Cloud Platform

Let’s stay in touch!

Sign up for our newsletter! You will receive a balanced portion of technological knowledge that you can easily transfer to the business world.

You can unsubscribe from these communications at any time. For more information, please view our Privacy Policy.

Rafał Gorzkowski

About the author

Our chief architect of backend solutions and data engineering. Research & Development are his second nature. The best at his profession.

contact us

Get in touch with us